Before a single shovel hits the dirt, your project exists in one place: your permit drawings. These plans are more than just a blueprint for your builders; they are the foundation of your entire permit application. If this foundation has cracks, like missing dimensions, incorrect scales, or vague details, your project’s timeline can easily crumble. The building department relies on these documents to verify safety and compliance, which is why Florida’s building permit drawing requirements are so strict. This guide breaks down the essential plans you’ll need and the critical details to include, ensuring your project is built on a solid, approvable foundation from the very start.
Key Takeaways
- Match Your Drawings to Your Project Type: The plans for a simple renovation are very different from those for a new commercial building. Ensure you have the correct set, including site, structural, floor, and MEP drawings, tailored to your specific project to meet local requirements.
- Prevent Delays by Focusing on Details: The most common reason for permit rejection is inaccurate or incomplete plans. Before submitting, meticulously check for missing dimensions, incorrect scales, and vague structural notes to ensure a smoother review process.
- Use Licensed Professionals for Guaranteed Compliance: Your plans are only valid if signed and sealed by a licensed Florida architect or engineer. This is a mandatory step that verifies your project’s safety and adherence to code, and working with an expert reviewer can help catch errors before submission.
What Drawings Do You Need for a Building Permit?
Think of your construction permit drawings as the official map for your project. This detailed set of plans is essential for getting legal permission to build or renovate, as it gives local authorities and your construction team a clear, shared understanding of the work you’re planning. You simply can’t get a permit without them. While the exact list of required drawings can change based on your project’s scope and location in Florida, a few key documents are almost always necessary.
At a minimum, you will need a site plan and a full set of construction drawings. The site plan provides a bird’s-eye view of your lot, showing property lines, easements, and the location of all structures. The construction drawings cover the nitty-gritty details of the build itself. To be considered valid, these plans must be prepared, signed, and sealed by a licensed Florida architect or engineer. Our team handles the submission of these critical documents as part of our permit expediting services, making sure everything is in order before it reaches the building department.
Why Accurate Drawings Are Key to Approval
Accurate and complete drawings are the key to a smooth permit approval process. Your plans are the foundation of your entire project, and any mistakes or missing details can lead to significant delays and costly revisions. It might seem like a small thing to leave out a dimension or a note, but plan reviewers are trained to spot these omissions. They need to verify that every aspect of your project follows local building codes and zoning regulations.
Great planning documents ensure everyone, from the inspector to your contractor, is on the same page. When your drawings are clear, compliant, and detailed, you reduce the chances of getting a long list of comments and corrections from the city or county. Taking the time to get your plans right from the start saves you headaches and keeps your project on schedule. If you need an expert eye on your plans, you can always request a proposal to have us manage the process for you.
Who Needs to Sign and Seal Your Plans?
In Florida, your construction drawings aren’t just sketches; they are legal documents that must be validated by a licensed professional. A licensed architect or engineer in the state must place their signature and official seal on your plans. This “signing and sealing” is their professional guarantee that the drawings are accurate, complete, and compliant with all applicable codes and engineering standards, ensuring public safety and structural integrity.
This requirement is non-negotiable for most construction projects. The seal acts as a stamp of approval, telling the building department that a qualified expert has reviewed and taken responsibility for the design. Having professionally sealed plans is a critical part of the permitting process because it reduces risk for everyone involved. It confirms your project is built on a solid, professionally vetted foundation, which is exactly what reviewers need to see before issuing an approval.
What Types of Drawings Will You Need?
When you submit a permit application, you’re essentially providing the building department with a complete instruction manual for your project. This manual is made up of several types of detailed drawings, each serving a specific purpose. While the exact requirements can vary based on your project’s scope and location in Florida, most construction jobs will require a standard set of plans. Getting these drawings right from the start is the single best way to avoid frustrating and costly delays. Think of them as the roadmap that proves your project is well-planned, safe, and compliant with all state and local codes. From a simple renovation to a brand-new build, these documents tell the whole story of what you intend to do and how you plan to do it correctly.
Site Plans and Property Surveys
First up is the site plan. Think of this as a bird’s-eye view of your entire property. It shows exactly where the new structure will sit in relation to your property lines, along with other key features like driveways, walkways, parking, and landscaping. The main goal of a site plan is to prove your project follows local zoning rules, such as setback requirements (how far your building must be from the property line). A clear and accurate site plan is one of the first things a permit office reviews, so getting it right is essential. It serves as the foundational map for your entire project, guiding construction and ensuring everything fits where it’s supposed to.
Foundation and Structural Plans
Next, you’ll need drawings that detail the bones of your building. Foundation and structural plans show how the building will be supported. This includes specifics about the foundation, whether it’s a concrete slab or a crawl space, detailing the materials, dimensions, and reinforcement needed. These plans are far more detailed than initial design sketches because they must demonstrate how the project will meet Florida’s strict safety and quality standards. An engineer typically prepares these drawings to ensure your building is strong and stable, a key part of Florida’s building recertification process for older structures.
Floor Plans and Layouts
Floor plans are the drawings most people are familiar with. They provide a top-down view of each level of the building, showing the layout of rooms, walls, doors, and windows. But for a permit, they need to be more than just a simple sketch. They must include precise dimensions for every room and space to confirm the layout meets building codes for things like minimum room sizes and emergency egress. These plans are essential for visualizing the flow of the space and for contractors to build the interior accurately. A well-dimensioned floor plan helps the permit reviewer understand the project’s scope and verify its compliance with residential or commercial regulations.
Elevations and Cross-Sections
While floor plans show the layout from above, elevations show what the building will look like from the outside. You’ll need a separate elevation drawing for each side of the building (north, south, east, and west). These drawings detail exterior finishes, roof pitch, and the placement of doors and windows, ensuring the final look complies with any local design ordinances. Cross-sections, on the other hand, are like a slice right through the middle of the building. They reveal the internal structure, showing how different levels connect and clarifying complex details like ceiling heights and stair construction. These drawings help reviewers and builders understand the project’s construction from the inside out.
Mechanical, Electrical, and Plumbing (MEP) Plans
Finally, you’ll need a set of drawings for the systems that make the building functional. MEP plans detail the mechanical (heating and air conditioning), electrical (wiring, outlets, and lighting), and plumbing (pipes and fixtures) systems. Each system requires its own detailed plan. For example, the electrical plan shows the location of every switch, outlet, and light fixture, plus the path of the wiring back to the panel. These plans are crucial for safety and ensuring all systems are installed correctly and according to code. Getting your MEP permits approved requires clear, precise drawings that leave no room for error.
What Details Go into Each Drawing?
When you submit your plans to the building department, reviewers are looking for specific information in each drawing. Think of it as a checklist: if a detail is missing, the review stops, and your project gets delayed. Getting these details right from the start is one of the fastest ways to get your permit approved. Each drawing tells a different part of your project’s story, from its position on the property to the nuts and bolts holding it together.
Site Plan Details
The site plan is the bird’s-eye view of your entire property. It shows exactly where the building will sit in relation to property lines, roads, and any other structures. This drawing must include key details like parking areas, driveways, walkways, and landscaping features. Its main purpose is to prove that your project complies with local zoning regulations, such as setback requirements (how far the building must be from the property line) and land use rules. A clear and accurate site plan is the first step in showing the city that your project fits into the neighborhood.
Foundation Plan Details
The foundation plan is the blueprint for the building’s base, detailing how it connects to the ground. This drawing illustrates the type of foundation being used, whether it’s a concrete slab, a crawl space, or a basement. It specifies the exact dimensions, the thickness of the concrete, the placement of footings, and the type of reinforcement materials required. In a state like Florida, where soil conditions and weather are major factors, this plan is critical. It provides the structural engineer’s assurance that the building will have a strong, stable base capable of supporting its weight for years to come.
Floor Plan Details
Floor plans are likely the drawings you’re most familiar with. They provide a top-down view of the layout for each level of the building, almost like a map. These plans show the arrangement of interior and exterior walls, the locations and sizes of doors and windows, and the placement of stairs. They are essential for visualizing the flow of the space and ensuring every room meets local building codes for minimum size, ceiling height, and emergency egress. A well-executed floor plan is key to creating a functional and compliant space, and it’s a core part of any permit application.
Structural Drawing Details
If the foundation is the base, the structural drawings are the building’s skeleton. These plans focus entirely on the framework that supports the entire structure. They provide detailed specifications for elements like beams, columns, trusses, and floor joists, showing exactly how they connect to bear the building’s weight. These drawings are non-negotiable for ensuring the building is safe and can withstand physical stresses, including Florida’s hurricane-force winds. For older buildings, ensuring structural integrity is also a key part of the building recertification process.
MEP System Details
MEP stands for Mechanical, Electrical, and Plumbing, and these drawings outline all of the building’s essential systems. The mechanical plans show heating, ventilation, and air conditioning (HVAC) systems. Electrical plans detail the location of wiring, outlets, light fixtures, and breaker panels. Plumbing plans map out the pipes for water supply and drainage, as well as the location of fixtures. These drawings are critical for making sure the building is functional, safe, and habitable. They show reviewers that all systems are designed to code to prevent issues like electrical fires or water damage.
How Florida Building Codes Impact Your Drawings
Navigating Florida’s building codes can feel like learning a new language, and your permit drawings are the ultimate test of fluency. These codes aren’t just guidelines; they are strict, legally enforceable rules that dictate exactly how your project must be designed and built for safety and resilience. From the state level down to your specific city or county, each layer of regulation directly shapes what needs to appear on your plans.
Think of your drawings as the primary way you communicate with the building department. They must clearly show that every aspect of your project, from the foundation to the roof, meets all applicable standards. Getting these details right from the start is the single most important step in avoiding frustrating and costly delays. Understanding how state, local, and environmental codes influence your drawings will set your project up for a smooth approval process.
Statewide Rules and Regulations
Every construction project in Florida starts with the same foundation: the Florida Building Code (FBC). This comprehensive set of regulations establishes the minimum standards for public health, safety, and welfare. Your drawings must demonstrate full compliance with these statewide rules, covering everything from structural integrity and fire safety to energy efficiency.
Professional, engineer-approved drawings are essential because they translate the FBC’s technical requirements into a clear, visual format. They prove to plan reviewers that your project is designed to be safe and structurally sound. Without this detailed documentation, it’s impossible to verify compliance, which is why a complete and accurate set of plans is non-negotiable for securing a permit anywhere in the state.
How Local City and County Rules Differ
While the FBC sets the baseline, your local city or county will almost always have its own set of specific rules to follow. These local amendments can add another layer of complexity to your drawing requirements. For instance, many municipalities require a signed and sealed survey showing property lines, easements, and the exact location of all existing and proposed structures.
These local ordinances often address issues specific to the community, such as zoning laws, aesthetic guidelines for a historic district, or unique land use requirements. This is where many projects get held up. What works in Orlando might not meet the requirements in Miami-Dade County. That’s why it’s so important to check with your local building department to ensure your drawings include all the necessary details they demand.
Special Rules for Hurricanes and High Winds
Given its location, Florida has some of the most stringent building requirements in the country related to wind resistance. If your project is in a High-Velocity Hurricane Zone (HVHZ), your drawings must include an exceptional level of detail to prove the structure can withstand powerful storms. This means specifying features like impact-resistant windows, reinforced roof-to-wall connections, and specific types of fasteners.
These hurricane-safe construction standards are constantly evolving as we learn more about storm performance. As a result, your construction documents must reflect the most current codes. Your plans will need to clearly illustrate how every component contributes to the building’s overall resilience, ensuring it’s not just built to code but built to last through Florida’s intense weather.
Drawing Requirements for Different Project Types
The drawings you need for a building permit depend entirely on what you’re building. A simple home renovation won’t require the same level of detail as a new commercial high-rise. Understanding these differences from the start helps you gather the right documents and avoid unnecessary back-and-forth with the building department. Each project type has its own set of rules, so let’s break down what you can expect for yours.
Residential vs. Commercial Projects
When it comes to residential projects, like adding a deck or remodeling a kitchen, your drawing requirements are usually straightforward. You’ll need clear plans showing the scope of work, but the documentation is less intensive. Commercial projects, on the other hand, are a different story. They require much more detailed plans that often include additional safety documentation, records showing ADA compliance, and sometimes even environmental impact studies. Because these spaces serve the public, the regulations are stricter to ensure everyone’s safety. Our team handles the permit process for all types of commercial and residential services.
New Builds vs. Renovations
Starting from scratch with a new build means you need a complete set of construction permit drawings. Think of these plans as the ultimate map for your project, guiding both the local authorities and your construction team from the foundation to the roof. For renovations, your drawings serve a slightly different purpose. They need to clearly show the existing structure and detail exactly what you plan to change. This helps the plan reviewer understand the project’s impact on the building’s integrity and safety. Whether you’re building new or updating an existing space, getting the drawings right is the first step to approval.
Industrial Projects
Industrial projects, such as warehouses or manufacturing facilities, have some of the most rigorous drawing requirements. These plans demand precision. You’ll need to submit fully engineered CAD drawings and detailed calculations that comply with Florida’s specific building codes, including those for high-wind zones. For these large-scale projects, every engineering and permit drawing must be accurate and actionable. This level of detail is essential to reduce risk, ensure compliance, and keep your project on schedule from day one. Properly prepared plans are critical for managing complex industrial projects and securing a smooth approval.
Common Drawing Mistakes That Cause Delays
You’ve poured countless hours into perfecting your project plans, and the last thing you want is a delay because of a simple, avoidable mistake on your drawings. Unfortunately, it happens all the time. A small error or omission can send your application right back to the drawing board, costing you precious time and money. The good news is that most of these issues are easy to prevent once you know what to look for.
Getting your drawings right from the start is the single best way to keep your project on schedule. When plan reviewers have everything they need, presented clearly and accurately, they can move through their checklist without hitting any roadblocks. This means fewer questions, no revision requests, and a much faster path to approval. Before you submit your application, it’s worth taking the time to double-check for these common pitfalls. Having an expert review your plans can also help you catch issues before the building department does. Our team handles these kinds of reviews every day as part of our comprehensive permit services.
Missing Dimensions or Incorrect Scale
Every line on your plan needs a purpose, and that purpose is usually defined by a measurement. When dimensions are missing, the plan reviewer is left guessing. They can’t approve a project based on assumptions. Make sure every wall, window, doorway, and structural element is clearly labeled with precise measurements. The same goes for the scale of your drawings. If your site plan is drawn at an incorrect scale, it throws off every other calculation, making it impossible for the reviewer to verify compliance with setback rules and other zoning requirements. This is one of the quickest ways to get your plans rejected.
Vague or Incomplete Structural Details
Your drawings need to tell the full story of how your project will be built safely and correctly. Vague notes like “standard footing” or “typical beam” aren’t enough. The plans must include specific details about materials, connection types, reinforcement schedules, and load-bearing capacities. Insufficient information forces the plan reviewer to issue a Request for Information (RFI), which formally stops the review process until you provide the necessary clarifications. Being overly detailed is always better than leaving room for interpretation. Think of your drawings as a complete instruction manual for the building department.
Not Enough Site Information
Your project doesn’t exist in a vacuum. The site plan provides the context, showing how your proposed construction fits within the property and its surroundings. A common mistake is failing to include enough information about the site itself. Your plans must accurately show property lines, easements, existing structures, utility locations (water, sewer, electric), and any changes in elevation. Without this complete picture, a reviewer can’t confirm that your project meets local zoning, land use, and environmental regulations. A thorough and detailed site plan is the foundation for a smooth review.
Ignoring Local Code Requirements
Florida has a statewide building code, but each county and city can have its own specific amendments and ordinances. What’s acceptable in one jurisdiction might not be in another, especially in areas with unique environmental factors like coastal zones or high-wind regions. Simply following the state code isn’t enough; you must design your project to meet the local rules where it will be built. Ignoring these specific requirements is a guaranteed way to face delays and required revisions. Before finalizing your drawings, it’s critical to research and incorporate all applicable local codes. If you’re unsure, our experts can help you understand the specific requirements for your project location when you request a proposal.
Who Should Prepare Your Permit Drawings?
Choosing the right professional to create your permit drawings is one of the most important decisions you’ll make for your project. These plans are the blueprint for your vision and the primary document the building department will review. The person you hire will translate your ideas into a technical format that proves your project is safe, compliant, and ready to be built. While it might seem like a simple step, the quality and accuracy of your drawings can make or break your timeline. Poorly prepared plans almost always lead to rejections, forcing you back to the drawing board and costing you valuable time and money.
The main players you’ll encounter are architects, engineers, and draftspersons. Each has a distinct role, and the right choice depends entirely on the scope and complexity of your project. A small interior remodel might only require a skilled draftsperson, while a new commercial building will need a full team, including architects and specialized engineers. Making the right choice from the start saves you from costly revisions and frustrating delays down the road. It’s about finding someone with the right expertise not just in design, but in the specific codes and regulations for your Florida city or county. This is where having an expert on your side can make all the difference.
Architect vs. Engineer: Who to Hire
Deciding between an architect and an engineer often comes down to your project’s primary focus. An architect is typically concerned with the design, aesthetics, layout, and functionality of a space. They are the visionaries who shape how a building looks and feels. An engineer, on the other hand, focuses on the science behind the structure. They ensure the building is structurally sound, the mechanical systems work correctly, and everything is safe. For many projects, you’ll need both. The architect creates the design, and the engineer makes sure it can be built safely and to code. A smart tip is to wait until your initial design concept gets planning approval before paying for highly detailed, technical drawings, as this can prevent you from having to redo them if the design changes.
Checking for the Right Licenses
Regardless of who you hire, they must be licensed to practice in the state of Florida. This is non-negotiable. A licensed professional’s stamp on your drawings is a requirement for most permit applications, as it signifies that a qualified expert has reviewed and approved the plans. However, a license is just the starting point. It’s more important that the person you hire has direct experience with your type of project. Someone who specializes in commercial high-rises may not be the best fit for a historic home renovation. Always ask to see a portfolio of similar work and verify their license with the state board to ensure it’s active and in good standing.
How a Permit Expediter Can Help
A permit expediter doesn’t draw your plans, but we play a critical role in making sure they get approved. Think of us as the project managers for your permit application. We work alongside your architect or engineer to review the drawings before they’re submitted. Our team is trained to spot common mistakes and ensure all the necessary information is included to meet local requirements. By investing in professional drawings and having an expert review them, you minimize risk and reduce project delays. Our permit expediting services handle the submission, manage communications with the building department, and address any required revisions, ensuring your project keeps moving forward without getting stuck in bureaucratic limbo.
How to Ensure Your Drawings Are Compliant
Submitting your permit drawings can feel like sending a final exam off for grading. You’ve put in the work, and now you just have to wait and hope for the best. But you can do more than just hope. By taking a few key steps before you submit, you can significantly improve your chances of a smooth, first-pass approval. It all comes down to careful review, clear communication, and complete paperwork. Getting these details right from the start helps you avoid the frustrating back-and-forth with the plan reviewer that can add weeks or even months to your project timeline.
Review Everything Before You Submit
Before your plans ever reach the building department, give them a final, thorough review. A complete set of drawings ensures everyone, from your client to your contractors, is on the same page and helps prevent expensive mistakes during construction. Go through each page with a fine-toothed comb. Check that all dimensions are accurate, the scale is correct, and every required detail is included. It’s far better for you to catch a small error now than for a plan reviewer to find it later. This simple quality check is one of the most effective ways to prevent initial rejections and keep your project moving forward.
Communicating with the Building Department
Don’t be afraid to talk to your local building department. A quick phone call at the beginning of your project can clarify specific requirements, as rules can vary from one Florida county or city to the next. Building officials are there to ensure projects are safe and up to code, not to create roadblocks. If they have questions or request revisions, respond quickly and clearly. Open communication prevents misunderstandings and shows you’re committed to meeting their standards. This proactive approach can prevent significant delays and build a positive relationship with the officials reviewing your project.
Getting the Right Signatures and Paperwork
Your drawings are official documents, and they need the right authorizations to be valid. Make sure all required signatures and seals from licensed professionals, like your architect or engineer, are on the plans before you submit them. You may also need to include additional forms, such as a Contractor’s Statement or other supplemental information sheets. Missing a single signature is one of the most common and easily avoidable reasons for a permit application to be rejected. We provide end-to-end service to ensure every piece of paperwork is correctly filled out and signed, so your submission is complete from day one.
How to Speed Up the Drawing Review Process
Waiting for your permit drawings to be reviewed can feel like the most frustrating part of any project. While every jurisdiction has its own pace, you have more control over the timeline than you might think. The key is submitting a flawless application package that gives the plan reviewer no reason to send it back with corrections. A clean, complete, and compliant set of drawings is your fastest path to approval. By understanding the process and preparing correctly, you can avoid common delays and keep your project moving forward.
What’s a Typical Timeline?
The honest answer is: it depends. A simple residential renovation in a small town might take a few weeks, while a large commercial build in a city like Miami could take several months. Your project’s timeline is influenced by its complexity and the building department’s current workload. Remember, you need approved building permits and construction drawings in hand before you can even think about breaking ground. Any changes to the project scope or design will require updated documentation, which often means the review clock starts all over again. Planning for this review period is a critical part of your project schedule.
What Can Slow Down Your Review?
The most common reason for a delayed review is an incomplete or inaccurate set of drawings. Not providing enough information is a frequent mistake that causes confusion and brings projects to a halt. When reviewers find missing details, incorrect scales, or vague notes, they have no choice but to issue corrections. This back-and-forth can add weeks or even months to your timeline. Other slowdowns include forgetting to address specific local code amendments, submitting outdated surveys, or failing to get the required signatures from your architect or engineer. Each of these errors is preventable with a thorough quality check before submission.
How a Permit Service Fast-Tracks Approval
This is where a permit expediter becomes your project’s most valuable player. Instead of submitting your plans and hoping for the best, our team at All Florida Permits manages the entire process for you. We review your drawings before they go to the building department, catching the common errors that cause delays. Because we work with municipalities across Florida, we know their specific requirements and can ensure your package is compliant from day one. By ensuring you have professional, permit-ready drawings, we minimize risk and help you get that approval stamp faster. If you’re ready to streamline your next project, you can request a proposal to get started.
Get Your Permit Drawings Right the First Time
Think of your permit drawings as the instruction manual for your project. If the instructions are unclear, incomplete, or incorrect, the building department will hit pause on your approval. In fact, poorly prepared plans are one of the top reasons for permit delays, forcing you back to the drawing board and costing you valuable time and money. Getting them right from the start is the best thing you can do to keep your project moving forward.
The key is to be incredibly thorough. Every detail matters, from accurate dimensions and scales to clear structural notes and material specifications. It’s also crucial to understand your local building rules, as requirements can vary significantly from one Florida county or city to another. What passes in Miami might not meet the specific standards in Orlando. Always check with your local building department to confirm their exact submission guidelines before you finalize your plans.
Remember that your drawings are living documents. If the project scope changes, your construction documentation needs to be updated immediately to reflect those adjustments. Submitting outdated plans is a guaranteed way to face rejection. By ensuring your drawings are clear, complete, and compliant with all local codes from day one, you set your project up for a much smoother review process. If you need expert guidance to make sure every detail is covered, our team is here to help.
Related Articles
- Permit Plans 101: A Guide to Fast Approval
- Florida Construction Permits 101: A Beginner’s Guide to Mastering Building Code Requirements
- Florida Building Permit Help: A Step-by-Step Guide
- Building Permits Florida Archives
Frequently Asked Questions
Can I draw my own plans for a small project? While it might be tempting for a minor renovation, most construction projects in Florida legally require drawings to be prepared, signed, and sealed by a licensed architect or engineer. This is a critical safety measure that confirms your plans meet all state and local building codes. For anything involving structural changes, electrical, or plumbing work, you will need a professional to create and certify your plans.
What’s the real difference between hiring an architect and an engineer? Think of it this way: an architect designs the vision, and an engineer makes sure that vision can stand up safely. Architects focus on the layout, aesthetics, and functionality of your space. Engineers concentrate on the structural integrity, systems, and technical specifications, ensuring the building is sound and compliant with safety codes. For most new builds and major renovations, you will need both to create a complete and approvable set of drawings.
Why do I need to worry about local rules if there’s a statewide Florida Building Code? The Florida Building Code provides the minimum safety and construction standards for the entire state, but it’s just the starting point. Your local city or county adds its own specific rules to address unique community needs. These can include zoning laws that dictate how land is used, aesthetic requirements for historic districts, or stricter regulations for coastal areas. Your drawings must satisfy both the state and local codes to be approved.
What happens if my drawings get rejected for having mistakes? If your plans are rejected, the building department will provide a list of comments detailing the specific issues that need to be fixed. This is a very common occurrence, but it does cause delays. You will need to work with your architect or engineer to make the required corrections, update the drawings, and then resubmit the entire package for another review.
Do I really need a full set of new drawings for a simple renovation? Not necessarily. The complexity of your drawings should match the scope of your project. For a simple interior remodel that doesn’t move walls, you won’t need the same extensive set of plans required for a new home. However, you will still need clear drawings that show the existing layout and precisely detail the planned changes to prove the work will be done safely and according to code.