What Is a Development Order? A Simple Guide

An orderly suburban neighborhood built with an approved residential development order.

Building in Florida without the right approvals is a gamble you don’t want to take. One of the most critical green lights you’ll need is a development order, which is the official government decision on your project. Skipping this can bring everything to a halt with massive fines, stop-work orders, or even demands to tear down what you’ve built. These aren’t just headaches; they’re costly mistakes that can jeopardize your entire investment. Before you break ground, let’s make sure you understand the process. This guide shows you how to stay compliant and keep your project moving forward smoothly.

Contact Us

Key Takeaways

  • Think of it as your project’s legal foundation: A development order is the official government decision that validates your project against all local zoning, safety, and community plans, bundling multiple permits into one comprehensive approval.
  • A strong application is your best strategy: Avoid common delays by preparing meticulous documentation and communicating with local planning authorities early. A pre-application meeting can help you resolve potential issues before they slow you down.
  • Skipping this step puts your investment at risk: Building without a development order can lead to more than just fines; it can result in stop-work orders, demolition requirements, and significant problems with your property’s future value and insurance coverage.

So, What Exactly Is a Development Order?

If you’re planning a construction or land use project in Florida, you’ll quickly come across the term “development order.” It sounds official and a bit intimidating, but it’s a fundamental piece of the puzzle. Think of it as the official green light—or red light—from your local government on your application for a development permit. This decision is the critical step that determines whether your project can move forward as planned. Understanding what it is, why it matters, and what common myths surround it will set you up for a much smoother process from the start.

What It Actually Means (and What It Doesn’t)

A development order is the formal, written decision a local government makes after reviewing an application for a development permit. It’s not the permit itself, but rather the official approval, denial, or conditional approval of your request. The term “development permit” is a broad umbrella that covers many types of approvals you might need, including building permits, zoning changes, subdivision plans, and special exceptions. So, when you apply for one of these, the government’s final say comes in the form of a development order. This document makes your project official and legally recognized, outlining any specific conditions you must follow.

Development Order vs. Developmental Order: A Key Distinction

When you’re dealing with the paperwork and legal jargon of Florida construction, it’s easy to get tripped up by similar-sounding terms. A common point of confusion is the difference between a “development order” and a “developmental order.” While they sound almost identical, they refer to completely different things, and knowing the distinction is key to keeping your project on track. A development order is the official, written decision from a local government that gives your project the go-ahead. It’s the document that confirms your plans meet all the necessary regulations and outlines any specific conditions you need to follow. In contrast, a developmental order is a term often used for orders placed before a project gets final regulatory approval and isn’t tied to the commercial production that follows. Think of the development order as the final approval for your construction, while a developmental order is more of a preliminary or separate step in a different process. Understanding this helps you communicate clearly and ensures you’re focused on securing the right approvals.

Why It’s a Must-Have for Land Use Planning

Development orders are the primary tool local planning authorities use to manage growth and ensure new projects fit into the community’s long-term vision. They help regulate how land is used, making sure that a new commercial building doesn’t disrupt a residential neighborhood or that a new subdivision has adequate infrastructure. By reviewing and approving projects through this formal process, municipalities can guide development in a way that is orderly, safe, and sustainable. For you as a developer, contractor, or homeowner, securing a development order is essential because it confirms your project complies with all local regulations, which helps you avoid costly delays and legal issues down the road.

Busting Common Myths About Development Orders

Many people think that getting a development order is a simple, straightforward step. In reality, the process can be quite complex, requiring a deep understanding of local zoning codes, environmental regulations, and community expectations. It’s much more than just filling out a form. Another common misconception is that development is only about large-scale construction. However, development orders cover a wide range of activities, from building a small addition to your home to planning a major subdivision. Navigating the requirements for any project, big or small, demands careful preparation and expertise to ensure all regulatory needs are met successfully.

Different Types of Development Orders

Not all development orders are created equal. Since each Florida county sets its own rules, the type of approval you need can change dramatically depending on your project’s location. This local specificity means you have to be aware of the unique requirements wherever you build, from Miami-Dade to the Panhandle. A great example of this is how Lee County handles smaller projects. Instead of putting minor improvements through the same rigorous process as a major subdivision, they created a more streamlined path to keep things moving efficiently for property owners and contractors. This kind of local variation is common across the state and highlights why a one-size-fits-all approach to permitting simply doesn’t work.

Example: Lee County’s Limited Development Order (LDO)

In Lee County, many smaller projects fall under a specific approval process known as the Limited Development Order (LDO). This system is designed to simplify the review for land use changes that don’t require a full, complex development order. It provides a clear and predictable framework, which is a huge help for anyone planning minor construction or land alterations. The county breaks LDOs down into five distinct categories based on the scope of work, ensuring the level of review matches the project’s impact. This structured approach helps local authorities manage growth effectively while giving developers a clear path to compliance.

Here’s a quick look at the five types of LDOs in Lee County:

  • Type A: Covers minor improvements that won’t significantly change the land.
  • Type B: Applies to projects adding hard surfaces like parking lots or driveways.
  • Type C: Used for outdoor sports facilities, such as tennis or basketball courts.
  • Type D: Required for the installation of utility lines and related infrastructure.
  • Type E: Pertains to the division of a single lot into two separate parcels.

Understanding these distinctions is critical. Aligning your project with the correct LDO type from the start helps you prepare the right documentation and meet the specific standards for that category. Getting this right is key to a smooth approval process, preventing the kind of frustrating delays that can throw your timeline and budget off track. Since every municipality has its own unique processes, knowing the local playbook is essential for success. Properly managing these specialized requirements is often the difference between a project that moves forward seamlessly and one that gets stuck in bureaucratic limbo.

What Permits Does a Development Order Include?

Think of a Development Order not as a single piece of paper, but as a comprehensive package of approvals that gives you the green light for your project. It’s the official go-ahead from local government, confirming that your plans meet all the necessary legal and community standards. Because it covers so many bases, a Development Order bundles several different types of permits and approvals together.

The exact permits you’ll need depend entirely on your project’s scope, from a simple home addition to a large commercial complex. A “development permit” is a broad term that can include everything from a standard building permit to a special exception or variance. Understanding what might be in your package is the first step to a smooth approval process. Let’s break down the most common components.

Securing Building and Construction Permits

This is the permit most people are familiar with. A building permit is your authorization to start construction or major renovations. It ensures that every aspect of your project—from the foundation to the roof—complies with Florida’s strict building codes and safety regulations. This includes structural integrity, electrical wiring, plumbing, and fire safety. Securing these permits is non-negotiable for any new build, addition, or significant remodel. They are a core part of nearly every Development Order and serve as proof that your project is safe, sound, and built to last.

Handling Zoning Permits and Variances

Before you can build, you need to make sure your project fits the neighborhood. That’s where zoning comes in. A zoning permit confirms that your project aligns with the area’s designated land use. For example, you can’t build a factory in a residential zone. Sometimes, a project might not perfectly fit the rules. In these cases, you might need a variance, which is a special exception to a zoning ordinance. Getting a variance or special exception is common for unique properties or when strict application of the rules would cause undue hardship, and it’s a key component of the overall development approval.

Getting Subdivision and Site Plan Approvals

If your project involves dividing a larger piece of land into smaller lots for sale or development, you’ll need a subdivision approval. This process ensures the new lots have proper access to roads, utilities, and public services. Alongside this, you’ll almost always need a site plan approval. The site plan is the detailed map of your project, showing the layout of buildings, parking lots, landscaping, drainage, and other features. Local authorities review it to make sure the development is well-designed, functional, and integrates smoothly with the surrounding environment.

Applying for Special and Conditional Use Permits

Some land uses aren’t automatically allowed in a specific zoning district but might be approved if they meet certain conditions. This is where special exceptions and conditional use permits come into play. For instance, a small café or a daycare might be allowed in a residential area if it meets specific criteria regarding operating hours, noise, and traffic. These permits offer flexibility in land use planning, allowing for valuable community amenities while giving local authorities the power to set conditions that protect the neighborhood’s character. Our team can help you determine if your project qualifies and guide you through the specialized permit process.

How to Apply for a Development Order: A Step-by-Step Guide

Applying for a development order can feel like a huge undertaking, but breaking it down into manageable steps makes the process much clearer. It’s all about careful preparation, clear communication, and understanding the timeline. Think of it as building a strong case for your project, showing local authorities how it fits within the community’s vision and complies with all the rules. From gathering your initial paperwork to navigating public hearings, each step is a building block toward getting your project approved. Let’s walk through what you can expect.

First, Get Your Paperwork in Order

Before you even think about filling out an application, your first step is to gather all the necessary documents. This is the foundation of your submission, and getting it right from the start saves you major headaches later. You’ll need detailed site plans, architectural drawings, and potentially specialized reports like traffic impact studies or environmental assessments. A great place to start is by reviewing your local planning department’s resources, which outline everything from permitted uses to specific building codes. This initial research ensures you have a complete picture of what’s required for your specific project and location.

Key Issues Your Project Plan Must Address

Once you have your documents ready, the next step is to build a project plan that anticipates the questions your local planning department will ask. A strong application does more than just meet the minimum requirements; it tells a clear story of how your project will responsibly integrate into the community. By addressing key concerns upfront, you demonstrate foresight and professionalism, which can make a world of difference in the review process. Here are the critical areas your plan must cover to get that green light.

Environmental Impact

Your project’s relationship with the natural environment is a major focus for Florida regulators. Your plan needs to show how you’ll manage your effects on the surrounding ecosystem. This includes protecting sensitive areas like wetlands, preserving habitats for local wildlife, and safeguarding any historical sites on or near your property. Depending on your location and the scale of your project, you may need to conduct thorough environmental assessments to prove your development will be a responsible steward of the land. This isn’t just about checking a box; it’s about respecting the natural landscape that makes Florida unique.

Traffic and Infrastructure

No project exists in a vacuum. Local authorities need to see that your development won’t overwhelm the existing infrastructure. Your plan must demonstrate that local roads can handle any new traffic without creating gridlock and that public utilities like water, sewer, and drainage systems have the capacity to support your project. This ensures that your development contributes to the community without straining its essential services. Proving you have a solid plan for infrastructure and traffic flow is crucial for gaining approval, especially for larger commercial or residential projects.

Zoning Compliance

Zoning is the rulebook that dictates how land can be used in a specific area, and your project must play by those rules. Your application needs to confirm that your intended use—whether it’s residential, commercial, or industrial—is permitted in that particular zone. If your vision deviates even slightly from the existing code, you may need to apply for a variance or a special exception. This is a common hurdle, but it requires a carefully prepared justification. Ensuring your project aligns with all local zoning regulations is a foundational step that prevents major delays and potential denials.

Community Standards

Beyond the technical regulations, your project needs to fit within the community’s character and long-term vision. Planning departments are tasked with guiding development in a way that feels orderly and enhances the quality of life for residents. Your plan should reflect an understanding of the local neighborhood. Does it align with the architectural style? Does it contribute positively to the area’s aesthetic and functional goals? Showing that your project is a good neighbor and a thoughtful addition to the community can be just as important as meeting the technical requirements.

Public Safety and Health

Ultimately, the government’s primary responsibility is to protect its citizens. Your project plan must prove that your development will be safe for people to occupy and use. This means strict adherence to Florida’s building codes, fire safety standards, and public health regulations. From structural integrity and electrical systems to accessibility and emergency access, every detail will be scrutinized to ensure it meets the highest safety standards. This is a non-negotiable aspect of your application, as it forms the basis of a safe and sustainable community.

Next, Submit Your Application Package

Once your documents are in order, it’s time to submit your application. Your goal here is to make it as easy as possible for the reviewer to understand your project and see that it meets all requirements. Each section of the application should clearly communicate your project’s purpose and how it adheres to local regulations. Be thorough and double-check everything for accuracy. An incomplete or unclear application is one of the most common reasons for delays. If you’re feeling overwhelmed, working with an expert can ensure your submission is professional, complete, and ready for review.

What to Expect: Reviews and Public Hearings

After you submit your application, the review process begins. Planning department staff will examine your proposal to ensure it complies with zoning laws, land use plans, and other regulations. This can take time, as the development process often faces delays due to the sheer volume of projects or the need for inter-agency coordination. Depending on the scale and impact of your project, a public hearing may be required. This is an opportunity for community members to ask questions and voice their opinions. Being prepared to present your project and address concerns is key to a successful hearing.

Understanding the Official Review Timelines

Once your application is officially accepted as complete, the review clock starts ticking. Generally, the local government has 120 days to issue a decision on your request—be it an approval, a denial, or an approval with specific conditions. If your project needs a public hearing, that timeline extends to 180 days. Remember, this clock only starts after your application is deemed complete, which is why a flawless submission is so critical for avoiding delays. You also need to be aware of other strict deadlines. For instance, if you need to challenge a government decision, Florida law often gives you just 30 days to apply for relief. Keeping track of these dates is essential to keep your project on schedule.

Breaking Down Impact Fees and Community Input

Two final pieces of the puzzle are impact fees and community input. Impact fees are charges collected by local governments to help fund the public infrastructure—like roads, parks, and schools—needed to support new development. These fees vary widely depending on your project and location. At the same time, community engagement is a vital part of the process. Proactively communicating with neighbors and local stakeholders can build support and address potential opposition early on. Managing these financial and social aspects is just as important as the technical details of your application.

Who’s in Charge? How Local Authorities Regulate Development

When you decide to build in Florida, you’re not just working with your own team—you’re also partnering with local authorities. Every city and county has a rulebook for development to ensure projects are safe and fit within the community’s plan. Understanding how these authorities operate is key to a smooth process. They are the gatekeepers of your project’s progress, from initial site plans to the final certificate of occupancy.

The Planning Department’s Role in Your Project

Think of the local planning department as the main checkpoint for your project. Their job is to manage the development process and make sure every aspect of your proposal is carefully reviewed against local regulations. While things like weather or supply chain issues can cause delays, a holdup at the planning department can often be avoided with a solid application. They are responsible for ensuring compliance before giving the green light, which is why having an expert handle the permitting process can make all the difference and keep your project on track.

Staying Compliant with Zoning and Environmental Rules

Before you break ground, your project has to clear one of the first major hurdles: zoning and land use regulations. Local authorities create these rules to protect the environment and maintain the unique character of a neighborhood. This means there are specific guidelines on what you can build, where you can build it, and how tall it can be. Ensuring your project complies with these local codes is a critical early step. Getting it wrong can lead to significant setbacks, so a thorough review of all applicable rules is essential before you submit any plans.

What If You’re Denied? The Appeals Process

What happens if your project doesn’t quite fit into the neat boxes of local regulations? That’s where the appeals and variance process comes in. If your application is denied, you can appeal the decision. Or, if your property has a unique hardship that makes it impossible to meet a specific rule, you can request a variance—basically, asking for an exception. Successfully getting an approval here requires a proactive approach and a deep understanding of local codes. You need to build a strong case, which is why many developers and homeowners request a proposal from professionals who can handle these complex situations.

The Formal Dispute Resolution Process (F.S. 70.51)

If you receive a decision on your development order that feels unfair or makes it nearly impossible to use your property, Florida law provides a formal path forward. This process, outlined in Florida Statute 70.51, is designed to protect property owners from government actions that are “inordinately burdensome.” It creates a structured way to challenge a decision without immediately heading to court. This applies not only to outright denials but also to enforcement actions or specific conditions attached to an approval that you believe go too far. It’s a protection built into the law for property owners like you, ensuring there’s a fair review when you feel a decision has crossed a line.

Timelines and Criteria for Filing a Dispute

Timing is everything when it comes to filing a formal dispute. Once you receive the written decision from the local government, you have exactly 30 days to file a “request for relief.” This is a strict deadline, so it’s crucial to act quickly. Your request must be submitted in writing to the same government body that issued the order. To qualify, you need to demonstrate that their decision is unreasonable or unfairly burdens your property. It’s not enough to simply disagree with the outcome; you must show how the action imposes a significant hardship, preventing you from reasonably using your land.

Potential Outcomes of a Dispute Resolution

When you file a dispute, your case is heard by a special magistrate—an impartial third party who reviews the facts from both sides. If the magistrate finds that the government’s action is indeed unfair, they won’t just overturn the decision. Instead, their role is to recommend a fair solution. They will suggest ways for the government to protect the public’s interest while also accommodating your right to use your property. This recommendation is then sent back to the local government for consideration. While it’s not a final verdict, a favorable recommendation from a magistrate carries significant weight and often leads to a positive resolution.

What Happens If You Build Without Approval?

Skipping a development order to save time or money might seem tempting, but it’s a gamble that rarely pays off. Building without the right approvals can create serious problems for your project, your finances, and your property’s future. The consequences go far beyond a simple fine—they can include complete work stoppages, legal orders to demolish your work, and long-term financial headaches. Here’s a closer look at the risks you take when you build without a permit.

The Consequences: Fines, Penalties, and Stop-Work Orders

Local authorities don’t look kindly on unpermitted construction. If you’re caught, you can expect hefty fines that often increase the longer the violation continues. Beyond the financial penalties, officials will almost certainly issue a stop-work order. This notice forces an immediate halt to all construction, leaving your project exposed and your timeline in limbo. Everything stays frozen until you can get the proper permits, a process made much more difficult because you’ve already broken the rules. Getting expert guidance from the start helps you avoid these costly and frustrating delays.

The Risk of Having to Demolish Your Work

This is the worst-case scenario for any property owner. If a structure is deemed illegal because it was built without a development order, the city or county can legally require you to tear it down at your own expense. All the money, time, and labor you invested are lost, and you’re left with the bill for demolition. This often involves a complicated legal process, adding even more stress and cost to the situation. It’s a devastating outcome that underscores the importance of securing all approvals before you even think about breaking ground.

The Impact on Your Property Value and Insurance

The problems with unpermitted work don’t end when construction does. When you decide to sell, that illegal addition or structure becomes a major red flag for buyers and lenders, often lowering your property’s value and making it much harder to close a deal. It also creates a huge insurance risk. Many policies will not cover damages related to unpermitted work. If a fire starts in an unpermitted room, your claim could be denied, leaving you responsible for the entire loss. Properly permitted work protects your investment, and All Florida Permits can ensure your project is fully compliant.

Common Roadblocks When Seeking a Development Order

Getting a development order approved can feel like a major hurdle, but knowing the common challenges ahead of time is the best way to prepare. From tangled regulations to unexpected budget shifts, many projects hit snags that can cause serious delays and drive up costs. By understanding these potential roadblocks, you can create a strategy to move through the process more smoothly and keep your project on track. Here are some of the most frequent issues that arise when seeking a development order in Florida.

Dealing with Complex Rules and Unexpected Delays

One of the biggest challenges is simply understanding the rules. Your project must comply with a dense network of local, state, and sometimes federal regulations. Each Florida county and municipality has its own specific zoning codes and land use plans, which can be difficult to sort through. A simple misinterpretation or oversight can lead to your application being rejected, forcing you back to the drawing board and causing significant delays. Staying on top of these ever-changing regulations requires constant attention and expertise, as what was permitted last year might not be today. This is where many projects get stuck before they even begin.

How to Handle Community Feedback and Opposition

Development doesn’t happen in a vacuum. Your project impacts the surrounding community, and residents will have their say. It’s common for developers to face questions or even resistance from local homeowners and community groups concerned about traffic, environmental impact, or changes to their neighborhood’s character. Public hearings are a required part of the approval process, and handling them successfully requires clear communication and a willingness to engage with feedback. Being prepared to address these concerns proactively can make the difference between a smooth approval and a contentious, drawn-out process that adds stress and time to your project.

Keeping Your Project on Budget and on Track

Sticking to a budget is tough when unforeseen costs can appear at any stage. Application fees are just the beginning. You might face unexpected changes in project scope due to regulatory feedback or discover that you need additional environmental assessments. These shifts can lead to revised plans and increased costs that weren’t part of your original forecast. That’s why it’s so important to get a clear picture of all potential expenses upfront. You can start by submitting a proposal request to understand the full scope of work and associated fees required for your specific project.

Why Accurate Documentation Is Non-Negotiable

A surprising number of delays are caused by simple paperwork errors. Incomplete applications, inaccurate site plans, or missing signatures can bring the entire review process to a halt. The permitting office reviews every detail, and a single mistake can get your application sent to the back of the line, costing you valuable time. Ensuring that every document is correctly filled out, signed, and submitted according to the jurisdiction’s exact requirements is critical. This meticulous attention to detail is non-negotiable for avoiding setbacks and keeping your project moving forward smoothly.

How Much Does a Development Order Cost in Florida?

Getting a development order is a major step, but it’s important to have a clear picture of the costs involved before you begin. It’s rarely a single line item on your budget; several different fees and financial considerations contribute to the final price tag. From the initial application to community contributions, each stage has associated costs that can vary widely depending on your project’s location and scale. Knowing what to expect can help you plan your budget accurately and avoid surprises down the road. Let’s break down the main financial components you’ll encounter when seeking a development order in Florida.

A Breakdown of Application and Permit Fees

First up are the direct application and permit fees you’ll pay to the local government for reviewing your plans. These costs are not standardized across the state and can differ significantly from one county or city to another. The complexity and size of your project are the biggest factors in determining the final amount. For example, a Development Permit Application Fee Schedule in a place like Broward County shows that a new Development of Regional Impact (DRI) can have an application fee of over $9,000. Even a minor change to an existing plan could cost several thousand dollars. These fees cover the administrative work required to process your application, conduct reviews, and ensure your project meets all local codes and regulations.

What Are Infrastructure Impact Fees?

Beyond the administrative costs, you’ll also encounter impact fees. Think of these as your project’s contribution to the community’s growth. When you build a new residential or commercial development, you create more demand for public services like roads, schools, parks, and utilities. Impact fees help fund the infrastructure needed to support that new demand, ensuring the community can grow sustainably. These fees are a standard part of development across the state. The good news is that Florida law requires local governments to give you credit for any contributions you make toward public facilities. This can include dedicating land for a park or funding road improvements, which can help offset the total amount you owe.

Don’t Miss These Deadlines and Expiration Dates

One of the easiest ways to keep your project on budget is by staying on top of your deadlines. Permits and approvals don’t last forever, and letting one expire can lead to costly penalties and delays. Missing a deadline often means you’ll have to pay a renewal fee or, in some cases, start the application process all over again. For instance, in some Florida cities, the renewal fee for an expired permit can be a minimum of the original permit cost or 25% of that fee, up to a maximum of $1,000, if you reapply within six months of expiration. Paying close attention to every timeline is critical for keeping your project moving forward without incurring unnecessary expenses.

4 Tips to Get Your Development Order Approved

Getting a development order approved in Florida doesn’t have to feel like a maze with no exit. With the right strategy, you can present your project clearly and confidently. It comes down to careful preparation, open communication, and knowing when to call in an expert. By following a few key steps, you can set your project up for a much smoother review process and get closer to breaking ground.

Prepare a Bulletproof Application

Your application is your project’s first impression—make it a great one. Before you fill out a single form, review the local planning department’s resources to understand the specific requirements for permitted uses, density, and building codes in your area. A complete and accurate application shows that you’ve done your homework and respect the process. Each section should clearly communicate your project’s purpose and, most importantly, how it aligns with local regulations and community standards. A well-prepared application minimizes back-and-forth with reviewers and is the fastest way to get a “yes.”

Talk to Local Authorities Sooner Rather Than Later

Don’t wait until you submit your application to talk to the planning department. Engaging with local authorities early is one of the smartest moves you can make. Schedule a pre-application meeting to discuss your project, ask questions, and get direct feedback from the people who will be reviewing your plans. This proactive approach helps you identify potential red flags before they become major problems. It also builds a positive, collaborative relationship with officials, showing them you’re committed to developing a project that benefits the community. This simple step can save you countless hours and revisions down the line.

Consider Working with a Professional

Development projects often hit snags that can push back timelines and drive up costs. That’s why having an expert on your side is so valuable. A professional permit expediter understands the complexities of the Florida permitting landscape and can anticipate challenges before they arise. Instead of you trying to manage endless paperwork and follow-ups, an expediter handles the entire process. We specialize in these systems, ensuring your application is complete and compliant from the start. If you’re ready to save time and avoid costly delays, request a proposal to see how we can help.

Maintain Compliance from Start to Finish

Securing your development order is a huge milestone, but it’s not the finish line. True success means staying compliant throughout the entire lifecycle of your project. This involves strictly adhering to the approved plans and meeting every condition laid out in the order. It’s crucial to understand that any deviation or change, no matter how small it seems, may require you to go back for another approval. Maintaining compliance protects your investment, prevents stop-work orders, and ensures your project contributes positively to the community. Our team provides end-to-end service to help you manage compliance from day one.

Related Articles

Contact Us

Frequently Asked Questions

What’s the real difference between a development order and a building permit? Think of it this way: a development order is the official approval of your project’s overall concept. It confirms that what you want to build is allowed on that specific piece of land according to zoning and land use rules. A building permit, on the other hand, is the permission to actually start construction. It confirms that your detailed plans meet all the required safety and building codes. You almost always need the development order first before you can get your building permit.

How long does it typically take to get a development order? There isn’t a one-size-fits-all timeline, as it really depends on your project’s complexity and the specific municipality you’re working with. A straightforward project with a perfect application might move through the process in a matter of weeks. However, a larger or more complex development that requires public hearings or multiple agency reviews can take several months. The single best way to speed things up is to submit a complete and accurate application from the very beginning.

What happens if I need to change my plans after my development order is approved? Making changes after approval is possible, but you can’t just alter the plans and keep building. You’ll need to formally submit your proposed changes to the local planning authority for review. Minor adjustments might be handled with a simple amendment, but significant changes could require you to go through a new review process. It’s critical to get any modifications officially approved to stay in compliance and avoid stop-work orders.

Do I really need a development order for a small home project? It depends entirely on the scope of your project and your local regulations. While you might not need a full development order for something simple like replacing a window, you very likely will for projects like building a room addition, installing a new pool, or constructing a guesthouse. These types of projects impact land use and require a formal review. Your best bet is to always check with your local planning department before you start.

Why should I hire a permit expediter instead of handling this myself? While you can certainly manage the process on your own, a professional permit expediter brings specialized knowledge that saves you time and prevents costly mistakes. We understand the specific codes and procedures for different Florida jurisdictions and have established relationships with local officials. We ensure your application is flawless from the start, manage all the follow-up, and troubleshoot any issues that arise, letting you focus on your project instead of the paperwork.